PMC
Assembly Line
The Multi Crane Scheduling Problem: A Comparison Between Genetic Algorithms and Neural Network approaches based on Simulation Modeling
The internal logistics for warehouses of many industrial applications, based on the movement of heavy goods, is commonly solved by the installment of a multi-crane system. The job scheduling of a multi-crane is an interesting problem of optimization, solved in many ways in the past: this paper describes a comparison between the optimization by the use of Genetic Algorithms and the machine learning piloting driven by Neural Networks. A case-study for steel coil production is proposed as a test frame for two different simulation software tools, one based on heuristic solution and one on machine learning; performances and data achieved from reviews and simulations are compared.